Duck Bay Road Bridge Closure January 23 and January 24 from 7:00 a.m. to 7:00 p.m.

Please note that Duck Bay Road Bridge will be CLOSED on January 23 and January 24 from 7:00 a.m. to 7:00 p.m.

The road closure is a result of work being done by Aecon, who will be installing two new porta holes into the existing roadway to support the installation of two new hydro poles on either side of the bridge.

The closure will be a ‘Full Closure’ at the location of the work during the hours of 7:00 a.m. to 7:00 p.m. A detour will be set-up for local traffic starting at HWY 400 to Quarry Road.

For more information please contact Dave Filippidis at 1-437-329-7470.

Thank you for your cooperation Tay Township Operations Staff.

Scroll to top