Road Improvement Program

What is the Road Improvement Program ?

The Road Improvement Program is part of the Township's Long-Term Plan, helping to ensure a timely, sustainable and economically responsible approach to maintaining and replacing local roadways throughout the Township.

In order to determine the appropriate timing of such works, Staff provide Council the distance, traffic counts and other considerations for each of these road sections.

2026 Road Improvement Updates

As part of the 2026 Road Improvement Program the following roads will be undergoing work. Please note pulverizing and staging may begin up to a month prior to paving work. Traffic may be restricted to a single lane at times.

2026 Road Program
Roads are listed in no particular order. Work will be completed as scheduling and conditions permit.

Talbot Street, Port McNicoll (in progress)
Paving improvements on Talbot Street will address surface wear and extend the lifespan of the roadway. This continued project supports ongoing maintenance efforts and will improve accessibility and overall traffic safety in the area. Project completion is estimated to be summer 2026.

Rumney Road, Victoria Harbour (from Hwy 12 to Elliott Side Road) 

  • Pulverizing
  • Fine-grading
  • Replacement of two catch basins 
  • Replacement of the storm leads  
  • Asphalt placement 

Municipal Office - 450 Park Street, Victoria Harbour 

  • Fine-grading 
  • Paving of the Municipal Office parking lot 

Talbot Street, Port McNicoll (from 9th Avenue to 1st Avenue) 

  • Pulverizing 
  • Replacement of all catch basins frames and grates 
  • Adjustments to all maintenance hole frames and covers and replacement where required 
  • Fine-grading 
  • Asphalt placement  

Fifth Avenue, Port McNicoll (from Hayes Street to Assiniboia Street)

  • Gutters and culvert works 
  • Pulverizing 
  • Fine-grading 
  • Asphalt placement 

Fourth Avenue, Port McNicoll (from Hayes Street to Albert Street)

  • Pulverizing 
  • Fine-grading 
  • Cross culvert replacement - complete 
  • Asphalt placement 

Second Avenue, Port McNicoll (from McNicoll Street to Talbot Street)

  • Pulverizing 
  • Fine-grading 
  • Cross culvert replacement - complete 
  • Asphalt placement 

Third Avenue, Port McNicoll (from Assiniboia Street and Davidson Street)

  • Pulverizing 
  • Fine-grading 
  • Asphalt placement 

Park Street, Victoria Harbour (from Industrial Road to Jephson Street)

  • Pulverizing 
  • Fine-grading 
  • Asphalt placement 

Elliot Sideroad, Victoria Harbour

  • Spot repairs between Rumney Road and Old Fort Road 

West Service Road, Waubaushene (from Quarry Road to approximately 1.2 km North)

  • Pulverizing 
  • Fine-grading 
  • Asphalt placement 
  • Shouldering 

Duck Bay Road, Waubaushene (from Coldwater Road to the bridge)

  • Pulverizing 
  • Fine-grading 
  • Cross culvert replacement 
  • Asphalt placement 
  • Shouldering 

Browns Line, Waubuashene (entire length) 

  • Pulverizing 
  • Fine-grading 
  • Turn around installation 
  • Asphalt placement 

Palmer Street, Waubaushene (entire length) 

  • Pulverizing 
  • Fine-grading 
  • Asphalt placement 
  • Shouldering 

Dodge Drive, Waubaushene (from Browns Line to Percy Street)

  • Pulverizing 
  • Fine-grading 
  • Asphalt placement
  • Shouldering 

Pine Street, Waubaushene (from Walnut Street to Hazel Street)

  • Pulverizing 
  • Fine-grading  
  • Asphalt placement  
  • Shouldering 

A reminder that pulverizing and staging may begin up to a month prior to paving work. Traffic may be restricted to a single lane at times.

For more information on the Road Improvement Program, please contact Tay Township Operational Services at 705-534-7248 x230.